TRACK RECORD OF ACCOMPLISHMENTS

The Company’s extensive and successful record of accomplishment make SKK Works an undisputed emerging industry player.
Accomplishment in the year:

Year 2013
  • Singapore PowerGrid NDC107 (HDD)
  • 1 Circuit of 66kV (Orchard Road) @ Length 114m
  • 2 Circuits of 66kV (Commonwealth Ave) @ Length 130m
  • 2 Circuits of 66kV (Pioneer Road) @ Length 110m
  • Term Contract – Diversion of 4 Circuit of 66kV (Jurong Island) @ Length 320m. (HDD)
  • Term Contract – Diversion of 2 Circuit of 66kV (Thomson Road) @ Length 140m. (HDD)
  • Singapore BlueTel Network 2 Ways of 110mm HDPE Telecom Pipe, Pioneer Road North “T” Junction Crossing @ Length 194m (HDD)
  • Taihan Eletric Wire Co. Ltd-NDC136,2 Circuits of 3 Ways 250mm + 2 Ways 160mm HDPE for 230kV at Tuas Ave 9, Ave 12, Ave 20 and Tuas South Ave 2 @ Length 3.0 km. (HDD)
  • Singapore BlueTel Network 2 Ways Of 110mm HDPE Telecom Pipe, Jurong West crossing PIE Expressway @ Length 110m. (HDD)
  • Singapore BlueTel Network 3 Ways Of 160mm HDPE Telecom Pipe x 2 crossing, Tampines Street 45 – TPE Expressway @ Length 156m. (HDD)
  • TM Hub Pte Ltd- 2 Ways Of 110mm PVC Pipe at Mandai Road Near LP 176 – 178 @ Length 33.26m
  • TM Hub Pte Ltd- 2 Ways Of 110mm PVC Pipe at Punggol Rd Near LP 208 & 209 @ Length 42m
  • TM Hub Pte Ltd- 4 Ways Of 110mm PVC Pipe at Mandai Road LP 272 & 276 @ Length 41m
  • TM Hub Pte Ltd- 2 Ways Of 110mm PVC Pipe at Kim Chuan Rd Near LP 30 @ Length 14m
  • TM Hub Pte Ltd- 4 Ways Of 110mm PVC Pipe at Woodlands South Flyover LP 104 & 105 @ Length 8m
  • TM Hub Pte Ltd- 2 Ways Of 110mm PVC Pipe at Tuas South Ave 3 Near LP 42 – 46 @ Length 60.5m
  • TM Hub Pte Ltd- 4 Ways Of 110mm PVC Pipe at Mandai Road LP 316 to LP 317 @ Length 57.1m
  • TM Hub Pte Ltd- 2 Ways Of 110mm PVC Pipe at Neo Tiew Road LP 66 @ Length 139.5m
  • TAKENAKA (Terminal 4 project) 4 Ways Of 110mm HDPE Telecom Pipe – AYE Espressway Crossing @ Length 66m , 3 Ways Of 110mm HDPE Telecom Pipe & 4 Ways Of 160mm HDPE Pipe – PIE Crossing @ Length 48m. ( HDD )
  • Public Utilities Board – Watermain Repairs and Other Contract Work for Network Services (West) Division for Year 2015 To 2017. (Contract Number: 1150274)
  • TM Hub Pte Ltd- 3 Ways Of 110mm PVC Pipe at Kranji Way LP 30 & 31 @ Length 59.4m
  • TM Hub Pte Ltd- 3 Ways Of 110mm PVC Pipe at Telok Paku Rd LP 14 & LP 16 @ Length 41.15m
  • TM Hub Pte Ltd- 3 & 6 Ways Of 110mm PVC Pipe at Hillview Avenue LP 58R6 @ Length (3 ways – 5.15m & 6 ways – 22.1m)
  • TM Hub Pte Ltd- 2 & 3 Ways Of 110mm PVC Pipe at Lim Chu Kang Road LP 204 & LP 163 @ Length (2 ways – 8.5m & 3 ways – 56.45m)
  • TM Hub Pte Ltd- 2 Ways Of 110mm PVC Pipe at Kheam Road LP 33 @ Length 14m
  • TM Hub Pte Ltd- 1 & 3 Ways Of 110mm PVC Pipe at Sennett Road @ Length (1 way – 5.8m & 3 ways – 45.6m)
  • TM Hub Pte Ltd- 2 Ways Of 110mm PVC Pipe at Hume Ave @ Length 25.35m
  • TM Hub Pte Ltd- 3 & 6 Ways Of 110mm PVC Pipe at Kew Drive LP 16-19 and Kew Crescent Near LP 1 @ Length (3 ways – 31.95m & 6 ways – 60.5m
  • TM Hub Pte Ltd- 1, 2 & 7 Ways Of 110mm PVC Pipe at Jalan Buloh LP 60 @ Length (1 way – 26m, 2 ways – 12.7m & 7 ways – 12.7m)
  • TM Hub Pte Ltd- 1, 2 & 7 Ways Of 110mm PVC Pipe at Jalan Buloh LP 101 @ Length (1 way – 58.5m, 2 ways – 6.5m & 7 ways – 11m)
  • TM Hub Pte Ltd- 1 & 4 Ways Of 110mm PVC Pipe at Tyresall Ave @ Length (1 way – 95.5m & 4 ways – 42.5m)
  • TM Hub Pte Ltd- 1 & 2 Ways Of 110mm PVC Pipe at Tyresall Ave LP 1 @ Length (1 way – 61m & 2 ways – 30m)
  • TM Hub Pte Ltd- 1, 2 & 4 Ways Of 110mm PVC Pipe at Cuff Road LP 2 @ Length (1 way – 54.8m, 2 ways – 15.5m & 4 ways – 31m)
  • TM Hub Pte Ltd- 1 Way Of 110mm & 160mm PVC Pipe at Mandai Road Between LP 32 & 34 @ Length (110mm – 69.7m & 160mm – 40m)
  • Bluetel Networks Pte Ltd – 24 Ways Of 110mm PVC Pipe at Near Ayer Rajah Ave @ Length 89.2m
  • Bluetel Networks Pte Ltd – 2 Ways Of 110mm PVC Pipe at Sims Drive LP 8 to 16 @ Length 141.3m
  • TM Hub Pte Ltd- 4 Ways Of 110mm PVC Pipe at Sembawang Road @ Length 22.3m
  • TM Hub Pte Ltd- 1, 2 & 3 Ways Of 110mm PVC Pipe at Toh Crescent LP 20 @ Length (1 way – 32m, 2 ways – 9.5m & 3 ways – 12.7m)
  • TM Hub Pte Ltd- 1, 2 & 4 Ways Of 110mm PVC Pipe at Upper East Coast Rd LP 96-97 @ Length (1 way – 62m, 2 ways – 6m & 4 ways – 1.5m)
  • TM Hub Pte Ltd- 1 Way Of 110mm PVC Pipe at Neo Tiew Road LP 66 @ Length 160.5m
  • Bluetel Networks Pte Ltd – 2 Ways Of 110mm PVC Pipe at Woodlands Road by Kg Mandai Kechil @ Length 147.8m
  • Bluetel Networks Pte Ltd – 2 Ways Of 110mm PVC Pipe at Ubi Ave 2 @ Length 222m
  • Bluetel Networks Pte Ltd – 2 Ways Of 110mm PVC Pipe at Sim Ave to Tanjong Katong Road Exit @ Length 165.6m
  • Bluetel Networks Pte Ltd – 2 Ways Of 110mm PVC Pipe at Paya Lebar Rd to Sims Ave @ Length 299.4m
  • Bluetel Networks Pte Ltd – 2 Ways Of 110mm PVC Pipe at Eunos Ave 5 to Paya Lebar Road @ Length 163.7m
  • Public Utilities Board – Watermain Repairs and Other Contract Work for Network Services (West) Division for Year 2016 To 2017. (Contract Number: 1160260)
  • Bluetel Networks Pte Ltd – 2 Ways Of 110mm PVC Pipe at Geylang East Central to Paya Lebar Road @ Length 204.9m
  • TM Hub Pte Ltd- 1, 4 & 5 Ways Of 110mm PVC Pipe at Mandai Lake Rd Nr LP 18 to LP 20 @ Length (1 way – 8m, 4 ways – 54.2m & 5 ways – 22.9m)
  • TM Hub Pte Ltd- 3 Ways Of 160mm PVC Pipe at Neo Tiew Ed LP 163 to LP 164 By Lim Chu Kang Rd Junction @ Length 59.8m
  • TM Hub Pte Ltd- 1 Way Of 110mm & 4 Ways Of 160mm PVC Pipe at Woodlands Road Near LP 333 @ Length (110mm – 21m & 160mm – 20.5m)
  • Mo Guan Trading Pte LTd (Starhub) 4 Ways Of 125mm HDPE Pipe – ECP Expressway Crossing @ Length 90m. (HDD)
  • Join Ages Constructions Pte Ltd (Starhub) 12 Ways Of 110mm HDPE Pipe – AYE Expressway Crossing @ Length 120m. (HDD)
  • Join Ages Constructions Pte Ltd – 3 Ways Of 250mm + 2 Ways Of 160mm HDPE Pipe – NDC140A1, Ayer Rajah II 230kV S/S to Upper Jurong II 230kV S/S @ Total Length 800m. (HDD)
  • Cable Works Corporation Pte Ltd – 4 Ways Of 160mm HDPE Pipe – NDC167 Route B @ Total Length 500m. (HDD)
  • TM Hub Pte Ltd- 2, 4 & 6 Ways Of 110mm PVC Pipe at Onraet Rd Near Blk CB2C @ Length (2 ways – 13.5m, 4 ways – 26m & 6 ways – 24.5m)
  • TM Hub Pte Ltd- 1 Way Of 110mm PVC Pipe at Tuas Link 4 From LP 30 to 32 @ Length 70m
  • TM Hub Pte Ltd- 2 Ways Of 110mm PVC Pipe at Woodlands Ave 12 By Woodlands Ave 5 Near LP120A @ Length 38.5m
  • TM Hub Pte Ltd- 1 & 3 Ways Of 110mm PVC Pipe at Hindhede Drive Near LP 6 @ Length (1 way – 46.5m & 3 ways – 13m)
  • Singapore-MIT Alliance for Research and Technology (SMART) Centre – Excavation and Hot Tapping Works for Online Monitoring of Water Distribution System @ NTU & NUS.
  • PKJV (Terminal 5 project) Changi Airport Near Runway 2 Location S21 – 12 Ways Of 125mm HDPE Telecom Pipes – Box Culvert Crossing @ 84m. (HDD)
  • Lum Chang Building Contractors Pte Ltd (T315, LTA) – 36 Ways Of  110mm HDPE Pipe – Xilin Ave @ Length 228m. (HDD)
  • TM Hub Pte Ltd- 1 & 2 Ways Of 110mm PVC Pipe at Williton Orchid 35 Murai Farmway @ Length (1 way – 19.5m & 2 ways – 19.5m)
  • TM Hub Pte Ltd- 1 & 2 Ways Of 110mm PVC Pipe at Lornie Road Near LP 27 @ Length (1 way – 6.2m & 2 ways – 20.7m)
  • TM Hub Pte Ltd- 1 & 2 Ways Of 110mm PVC Pipe at Seletar North Link Near LP 70 @ Length (1 way – 12.5m & 2 ways – 12.5m)
  • Public Utilities Board – Replacement and Network Enhancement If Watermains For Network Services (West) Division for Year 2016 To 2019. (Contract Number: 1160455)
  • Poh Huat Heng Corporation Pte Ltd -NDC 211 Route B, 8 Circuits Of 3 Ways 250mm + 2 Ways 160mm HDPE for 230kV – Tembusu Crescent, Tembusu Ave And Jurong Island Highway @ Total Length 2.0 km. (HDD)
  • Join Ages Constructions Pte Ltd – NDC 196 Route A1, Ayer Rajah II 230kV S/S to Choa Chu Kang 230kV S/S – 3 Ways Of 250mm + 2 Ways Of 160mm HDPE Pipe @ Total Length 2.0 km. (HDD)
  • Poh Huat Heng Corporation Pte Ltd – NDC 193 Route B, 2 Circuits Of 3 Ways 280mm + 2 Ways 180mm HDPE for 400kV – Undercrossing Existing Box Culvert at West Coast Island to Labrador II S/S (Feeder 2&3) @ Length 1.3 km. (HDD)
  • Taihan Electric Wire Co.Ltd-NDC 211 Route A, 1 Circuit Of 3 Ways 250mm + 2 Ways 160mm HDPE for 230kV From Tagore Shaft To Tampines 230kV S/S @ Length 10.0 km. ( HDD )
  • Public Utilities Board – Watermain Repairs and Other Contract Work for Network Services (East) Division for Year 2018 to 2021 (Contract Number: 1180201)
  • SP Powerassets Limited – Pipe Installation by HDD Works (Contract Number: 9190242)
  • Taihan Electric Wire Co.Ltd-NDC 253E, Supply and Installation of 66Kv Power Cables, Auxiliary Cables and Accessories (NDC253) – Route E @ Length 2.85km. ( HDD )
  • Public Utilities Board – Watermain Flushing Services for Network Services Division for Year 2017 To 2020. (Contract Number: 1180064).
  • Public Utilities Board – Watermain Repairs and Other Contract Work for Network Services (West) Division for Year 2019 to 2023 (Contract Number: 1190217)
  • Lee Hong Construction Co. Pte. Ltd – 1180415A (CW) / 1180415B(WSN), Improvement To Roadside Drains And Watermain Replacement Works Under Estate Upgrading Programme Batch 9 – Contract 2
  • Starland Construction Pte Ltd – Improvement To Roadside Drains And Watermain Replacement Works Under Estate Upgrading Programme Batch 9 – Contract 3
  • Taihan Electric Wire Co.Ltd-NDC 253Q, Supply and Installation of 66Kv Power Cables, Auxiliary Cables and Accessories (NDC253) – Route Q @ Length 900m. ( HDD )
  • Taihan Electric Wire Co.Ltd-NDC 253P, Supply and Installation of 66Kv Power Cables, Auxiliary Cables and Accessories (NDC253) – Route P @ Length 3.2km (HDD)
  • Singapore Telecommunications- SWOC20100815, Underground Pipeline As- built Mapping by Gyroscopic Mapping (Reduct Tool) Method
  • Singapore Telecommunications- SRFT20010283, Installation of High-Density Polyethylene (HDPE) Pipes by Horizontal Directional Drilling (HDD) Method
  • Taihan Electric Wire Co.Ltd-NDC 253D2, Supply and Installation of 66Kv Power Cables, Auxiliary Cables and Accessories (NDC253) – Route D2 @ Length 1.375km. ( HDD )
  • Taihan Electric Wire Co.Ltd-NDC 253D2, Supply and Installation of 66Kv Power Cables, Auxiliary Cables and Accessories (NDC253) – Route D2 ( CABLES WORKS)
  • SP Powerassets Limited – Pipe Installation by Horizontal Directional Drilling Works (TERM) (Contract Number: 9190345)
  • Taihan Electric Wire Co.Ltd-NDC 22, 1 Circuit Of 4 Ways 160mm HDPE for 66kV From Bukit Batok Road To Boon Lay Way @ Length 2.0 km. ( HDD )
  • Golden Singa Engineering (Singapore) Pte Ltd, Proposed HDD Works For 230kV @ Gambas Ave Near LP 73-LP 79 (Span 01) & Near LP 113 – LP 119 (Span 02) Under Contract: 91200100 (Contract Number: SKK2021010013R)
  • Hi Power Pte Ltd, NDC309C, Proposed HDD Works For Installation 5 nos of 160mm (SDR 13.6) HDPE Pipe For 66kV Cables from Woodlands Ave 8 230kV / 66kV SS – Route C @ Length 1.6km. ( HDD )
  • Public Utilities Board – Maintenance & Replacement of Appurtenances for Water Supply Network from 2020 to 2023 (Contract Number: 1200283)
  • Public Utilities Board – Repair and Diversion of Pumping Mains and Sewers (Contract Number: 1210050)
  • Singapore Telecommunications- SRFT21090266, Installation of High-Density Polyethylene (HDPE) Pipes by Horizontal Directional Drilling (HDD) Method
  • Public Utilities Board – Supply and Laying of Watermains in Tengah New Town for Year 2022 to 2026 (Contract Number: 1220222)
  • Singapore Telecommunications- SRFT22060996, Installation of High-Density Polyethylene (HDPE) Pipes by Horizontal Directional Drilling (HDD) Method
  • Taihan Cable & Solution Co Ltd- NDC322F, Supply and Installation of 66kV Power Cables, Auxiliary Cables and Accessories (NDC322) – Route F (CABLES / HDD WORKS)
  • Public Utilities Board – Repair and Condition Assessment of Pumping Mains – Schedule A (Contract Number: 1230189)
  • Public Utilities Board – Provision of Sewer and Manhole Repair Services (East/West) for 2023 – 2026 – Schedule A – Eastern Catchments (Contract Number: 1230318)